
2015 · Laajennus peruspeliin
Power Grid: High-Voltage DC Transmission Passage C
Adds a future high-voltage DC transmission corridor across the Germany map that gradually removes connection costs between the northern and southern endpoints as the line is built. Players cooperate in building the transmission line step by step, while still competing as power companies to supply cities. The expansion introduces a shared construction track that changes network connectivity and requires players to pay a tax when using the newly served cities until construction is complete. Designed as a small map-specific add-on, it integrates with the standard Germany setup and modifies routing and cost dynamics without changing core game phases.
- Pelaajat
- 2–6 paras 4
- Peliaika
- 120 min
- Ikä
- 12+
- Monimutkaisuus
- 3 / 5
Tietoa pelistä
- Suunnittelu
- Kuvitus
Laajennus peliin
Katso ne LudoyassaLudoyan pöydissä
Kaikki tilastot Ludoyassa- 5
- Kokoelmissa
Ilmainen, verkossa, Androidilla ja iOS:llä
Pelaa peliä Power Grid: High-Voltage DC Transmission Passage C Ludoyalla
- Pidä se kokoelmassasiPidä kirjaa kappaleestasi ja sen laajennuksista, lainaa sitä ystäville tai lisää se toivelistallesi ja saat tiedon, kun hinta laskee.Lisää se kokoelmaasi
- Kirjaa jokainen pelisessioPisteet, voittajat, ajastimet ja kuvat, sitten tilastosi: voittoprosentti, suosikkipelaajamäärä, paras tulos.Kirjaa pelisessio
- Pisteet ilman paperiaKäytä yhteisön pistelomakkeita ja peliapureita ja anna Ludoyan laskea pisteet.Etsi pistelomakkeita
- Löydä pelikavereitaKerhot, peli-illat ja tapahtumat lähelläsi, joissa tätä peliä pelataan.Katso tapahtumat
Pelin tiedot (pelaajat, peliaika, ikä, tekijät) lähteestä BoardGameGeek.


