Power Grid: Québec/Baden-Württemberg

2012 · Extension pour le jeu de base

Power Grid: Québec/Baden-Württemberg

Two new regional maps present distinct energy networks and rule tweaks for the core auction-and-network game. The first map models a province with abundant hydro resources; green hydro plants behave specially in the plant market and several cheap local connections create tight decisions about where to build and when to expand. The second map represents a smaller, denser region where the round sequence is altered—players buy power plants before reordering turn order—and some cross-regional connections only open in later phases. Players bid for power plants, buy resources, build network connections on the map, and power cities to score income, adapting strategies to each map’s unique constraints.

Joueurs
2–6 idéal à 5
Temps de jeu
120 min
Âge
13+
Complexité
3,1 / 5
8 sur Ludoyaà partir de 10,55 €Industrie / fabricationÉconomiqueEnchères / OffresConstruction de réseaux et de routesRevenus

Où l'acheter

Prix des boutiques et exemplaires d'occasion, vérifiés chaque jour.

Comparer tous les prix dans Ludoya

Sur les tables de Ludoya

Toutes les statistiques dans Ludoya
3
Parties enregistrées
11
Joueurs
10
Dans des collections

8,0/10

sur 2 avis Ludoya

Lire les avis et le noter

Données du jeu (joueurs, durée, âge, crédits) issues de BoardGameGeek.