Power Grid: Québec/Baden-Württemberg

2012 · Expansão para o jogo base

Power Grid: Québec/Baden-Württemberg

Two new regional maps present distinct energy networks and rule tweaks for the core auction-and-network game. The first map models a province with abundant hydro resources; green hydro plants behave specially in the plant market and several cheap local connections create tight decisions about where to build and when to expand. The second map represents a smaller, denser region where the round sequence is altered—players buy power plants before reordering turn order—and some cross-regional connections only open in later phases. Players bid for power plants, buy resources, build network connections on the map, and power cities to score income, adapting strategies to each map’s unique constraints.

Jogadores
2–6 melhor com 5
Tempo de jogo
120 min
Idade
13+
Complexidade
3,1 / 5
8 na Ludoyaa partir de € 10,51Indústria / FabricaçãoEconômicoLeilão / LancesConstrução de redes e rotasRenda

Onde comprar

Preços das lojas e cópias usadas, verificados todos os dias.

Comparar todos os preços na Ludoya
3
Partidas registradas
11
Jogadores
10
Em ludotecas

8,0/10

de 2 avaliações na Ludoya

Leia as avaliações e dê sua nota

Dados do jogo (jogadores, tempo de jogo, idade, créditos) do BoardGameGeek.