索爾頓湖

2024 · 工业/制造业

索爾頓湖

Players run competing geothermal companies extracting brine from a salty lake to obtain lithium and build an energy business. On each turn a player places one of four engineers on action spaces to perform industrial (explore, drill, extract, process, repair), commercial (sell, acquire and execute contracts) or management (research, buy shares, develop projects, finance) actions. Production, processing and contract execution generate points while research and company development unlock new capabilities. Multiple routes score points — exhausted land, completed contracts, short-term objectives, corporate growth and research all contribute to victory. Plays 1–4 players, about 120 minutes.

人数
1–4 最佳 2 人
游戏时长
120 分钟
年龄
12+
复杂性
3.9 / 5
7.5 来自 Ludoya¥194.16 起单人 / 接龙游戏工人放置手牌管理

关于这款游戏

Publisher

来自 Ludoya 牌桌的照片

在 Ludoya 中查看所有照片
  • 桌上的索爾頓湖,照片来自 NETes

在哪里买

商店价格和二手货源,每天检查。

在 Ludoya 中比较所有价格

在 Ludoya 的牌桌上

在 Ludoya 中查看完整统计
179
已记录对局
252
玩家
2h 17m
平均时长
140
收藏数
7
愿望清单数

7.5/10

基于 41 条 Ludoya 评测

  • 乐趣8.0
  • 互动5.0
  • 重玩性7.0
  • 独特性7.0
  • 外观6.0
  • 无障碍6.0
阅读评测并打分

规则问题

由 Ludoya 的规则助手根据规则书回答。

If I place an engineer on an action space, is that space blocked for everyone until the round ends?

Yes — when you assign an engineer to an action space that space is blocked until the end-of-round return phase; placing additional engineers increases the action’s strength (pp. 10, 14).

How do I pay with action/money cards — do I get change or special effects?

You pay by discarding $1/$3/$5 action cards to meet costs and you do not receive change; some action cards also grant discounts or modified effects when used (p. 15; see action-card lists pp. 34–36).

Can I sell to more than one corporation in a single Sell action?

No — a Sell action targets one corporation, though you may sell up to three product units to that corporation in the same action and you gain the stated cash/VP while advancing its value track (pp. 22–23).

How do contracts work — when do I take and when do I resolve them?

You acquire contracts to your board and execute them by placing an engineer and paying the required product units to receive money/VP/shares/etc.; contracts are removed or resolved during the end-of-round procedures (pp. 24, 12).

What happens when I use the Drill action — does it cause damage or 'freeze' the drill?

The Drill action lowers the drill and applies rock damage along the drill track; certain track spaces trigger freezing or multi-layer effects as indicated on the drill track (p. 17).

Do I need a plant to process brine into lithium or geothermal, and what are the values?

Yes — processing requires a working plant; you can convert brine into lithium (base $6) or geothermal/energy (base $4), with optional bonuses available (+3 lithium or +2 energy) when meeting their conditions (p. 20).

打开 Ludoya 的规则助手,它会阅读这款游戏的规则书。

记分表和游戏辅助工具

  • Fulla de Puntuació
  • Kit de juego
在下一局中使用

游戏信息(人数、游戏时长、年龄、制作人员)来自 BoardGameGeek